ѻý

Skip to content

Proposed logging prompts call for moratorium

Protest being driven by memories of the landslides Swansea Point experienced in 1997 and 2012.
web1_20170319-SAA-Hummingbird-creek-people-JE-0012
Steve Corrie, Sylvia Lindgren, David Schurek and Lois Schurek overlook Hummingbird Creek on the Schureksѻý property on Sunday, March 19. -Image credit: Jim Elliot/Eagle Valley News

A proposed logging operation near Hummingbird Creek has unleashed a wave of protest by Swansea Point residents and others who donѻýt want to see history repeated.

The floodgates opened when Swansea Point residents Lois and Dave Schurek received a letter from Tolko Industries Ltd., dated Feb. 22, informing them of 11 cutblocks being proposed for the uplands above Swansea Point and the Schureksѻý home, located on the east side of Highway 97A along Hummingbird Creek.

ѻýThis letter is being sent to you as a domestic water licence holder adjacent to our Crown land operating area and as part of our information sharing referral processѻý,ѻý the letter states.

The Schureks, to Loisѻý knowledge, are the only ones in Swansea Point to have received this correspondence.

ѻýWe only got the letter because we have water rights in that creek and they want to log that 7016 blockѻý and itѻýs within 1,000 metres of our well,ѻý said Lois. ѻýIf they had left that one off and only went for 10, they wouldnѻýt have had to notify us. So weѻýre the only ones that got notification and thatѻýs our only way to object.ѻý

The Schureks have since ignited a protest against the proposal, a response driven by memory of the large, devastating debris flows Swansea Point experienced in 1997 and 2012, as well as numerous smaller mudslides in the area, including one that occurred on Tuesday, March 14.

The Schureks say past upland logging operations contributed to those debris flows, and they donѻýt wish to see another.

ѻýThere is no question that weѻýre going to have this again,ѻý said Schurek.

Tolko spokesperson Janice Lockyer said the letter received by the Schureks is part of a process thatѻýs in its infancy.

ѻýWe are well aware of the concerns and we are looking at the geography of the area and all that stuff,ѻý said Lockyer.

ѻýI think whatѻýs really important for people to understand right now is this is a very preliminary part of the process. We are working right now with a hydrologist and geotechs to start the modelling for this process. So weѻýre not even looking at hanging ribbons until next year. We have a lot of work to do before we even understand whatѻýs going on there, or whether it will work or what kind of adjustments weѻýll need to make.ѻý

In response to Tolkoѻýs letter, the Schureks are calling for a moratorium on all logging activity above Swansea Point. Others from the community who have since learned of the proposed cutblocks are doing the same.

ѻýI donѻýt think thatѻýs unreasonable,ѻý said Lois. ѻýThatѻýs not anti-logging. Thatѻýs a small piece of land considering all of the mountains in B.C. But it would certainly save a lot of lives.

ѻýIn 1997, there was 120 to 125 homes, now thereѻýs 500. So when you say youѻýre going to put that many people in harmѻýs way ѻý because it happens in the summer, these slides donѻýt happen in the wintertime when theyѻýre empty.ѻý

Jim Cooperman and Shuswap Environmental Action Society are also supporting the Schureks, stating it would be completely irresponsible to clearcut log the unstable hillsides above Swansea Point.

ѻýWithout tree cover, more snow accumulates on clearcuts and it melts faster, especially when it rainsѻý,ѻý said Cooperman. ѻýGiven the instability of this hillside, we can expect more slides across the highway and perhaps even more damage to private properties. As well, with climate change intensifying, there will be more intense storms that will further increase the potential for more landslides in the future.ѻý

The Schureksѻý certainty that logging practices contributed to past debris flows is founded in part on a legal action they took against the province and a logging company that had been working in the hills above Swansea Point prior to the ѻý97 debris flow. That disaster rolled through Loisѻý elderly parentsѻý home and property while they were at home, and she said despite having physical ailments, they managed to survive the ordeal.

ѻýI did my homework, in 1997 I rented an airplane, went up and took a look,ѻý said Schurek. ѻýThen we went up and filmed it in a rain storm. When I had that to show them, they just folded and said, ѻýweѻýll pay you, and we got it.ѻý

ѻýTrees absorb something like 60 to 70 per cent of the rainfallѻý We did huge studies when we won our case. The roots absorb it so it doesnѻýt get to the bedrock and the hard place and it doesnѻýt cause the (soils) to slip. You take them out and youѻýre going to have slippage constantly.ѻý

The Schureks have sent their ѻýTolko packageѻý of letters to Tolko as well as local politicians, including Shuswap MLA Greg Kyllo. He passed the information on to the Ministry of Forests, Lands, and Resource Operations, according to spokesperson Dave Townsend.

Responding to a request for comment, Townsend said the watershed above Swansea Point is within Tolkoѻýs industry forest licence and the ministry expects all forest licencees ensure risks to environmental integrity and public protection are appropriately mitigated in the planning process.

He said the ministry is currently aware of local residentsѻý concerns and will be in contact with them.

ѻýTolko advises that the planning process will take 12 to 18 months to complete and that no layout on the ground is anticipated for two years,ѻý said Townsend. ѻýThe ministry has been assured that they are committed to continued communication with residents throughout the planning process.ѻý



Lachlan Labere

About the Author: Lachlan Labere

Editor, Salmon Arm Observer
Read more



(or

ѻý

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }